Challenge

Rosneft needed to build an exhibition pavilion for the XXII Olympic Winter Games in Sochi in 2014.

Solution

For the construction of the exhibition pavilion, ProfHolod supplied more than 7,000 sq. m of sandwich panels with PIR filler. ProfHolod manufactured the panels in a tight timeframe of 7 days. The Rosneft exhibition pavilion was built as a collapsible structure: it was assembled two months before the opening of the Olympics and dismantled one month after the Games ended.

alt
alt
alt
alt
alt
alt

Building a similar facility?

Request a free consultation today and we will get back to you within an hour during business hours.

gototop